TitleProduct

Electrical Stamping Part

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2021-07-28 19:48

  • Browse the number:

    452

Send an inquiries

Company Profile

Ningbo S.W Electric Co., Ltd

By certification [File Integrity]

Contact:nbswdq(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.switchsocketparts.com/ http://nbswdq.world-led.net/

Product Details

Main Material: iron, stainless steel, copper, brass;

Key point on quality: the final finishing status. Size tolerance & material grade;

Short description: We will copy it from your samples & drawing. From draft design to final shape

Specification: it depend on choice of material. Normal we prefer the thickness in plug tolerance, not minus. But the final option is fixed by designer & drawing.


Finished shape:


Application:

For electrical items, they are for switch, socket, extension socket, multi-adaptor, fuse switch, lamp holder.


Qualty control:

About switch, the key point is material character. Also the silver part.


For socket item, they should be in copper material, not brass material. As male pin in 4mm and 5mm will work on them. If material is not good, it will be very loose after working with 5mm male plug. About thickness, desired one is in 0.8mm, not 0.5mm, Also if the structure agrees, we should add clip to control the opening.


For saving cost and improve the quality of complete product, some Electrical stamping part are design for automatic assembling. If in this case, we should control the complete finishing from raw material, metal parts finishing, package and final handling for each connection. Any step out of order will be problem for complete finished product quality. Also the best solution is to reduce the finishing step from product design. As mechanical design is also another key factor. As even some finished step failed, it can be reformed via product structure.


Design and production time: 35-45days.


http://www.switchsocketparts.com/